— NOW SELLING —
29 – 31 Margaret Street, Kilsyth 3137

1 x Double Storey · 4 bed · 2 bath . 2 wc . 2 car (House 4)
3 x Double Storey · 3 bed · 2 bath . 2 wc . 2 car (House 1, 5 & 8)
2 x Double Storey · 3 bed · 2 bath . 1 wc . 2 car (House 3 & 6)
2 x Double Storey . 2 bed . 2 bath . 1 car (House 2 & 7)

Summary: 8 fantastic homes, varying floor plans, large open living spaces, significant leafy outdoor areas, storage, comfort and a brilliant location.

Planning: Permit received 

Construction: Estimated 2nd Quarter 2023

Completion: Estimated 2nd Quarter 2024

About the Development:  What a brilliant location this is.  Not only close to all amenities but you could be excused for thinking you were standing in the middle of the country as this area is surrounded by leafy green parks and streets.  This combination of train stations, shops, freeway access and a lush green outlook is a brilliant benefit gained from living in Melbourne’s eastern suburbs.     

These eight brand new homes will include the very best of materials ensuring your purchase will deliver everything you ask of it for years to come.     

As well as a sought after floor plan, these homes are made from only the very best materials leaving no stone unturned when it comes to the highest quality.  Some of the companies associated with these new homes include -

Bricks by Nubrik - Austral, Roof by Colorbond, walls and trim by James Hardie, colours by Dulux, appliances by Westinghouse, internal Tasmanian Oak flooring and trimming, air conditioning by Rinnai, hot water by Rinnai, garage doors by B&D, Doors by Hume and locks by Gainsborough  just to name a few.  

Featuring two, three and four bedrooms with private ensuites, large laundry spaces, internal garages and storage, open plan living, kitchens with stone benchtops, as well as heaps of outdoor room there is sure to be a floor plan and style that suits.          

Join one of Melbourne’s most exciting growth suburbs in your brand new Birkill built home.  Take advantage of stamp duty concessions and a host of other grants available from the government most of which are only accessible when purchasing a new build.  Look now, plan early and enquire below.

Building Stage Updates

  • This stage involves clearing the land, leveling the ground, and preparing the site for construction.

  • This stage involves the construction of the foundation, which is the base of the structure. This may include pouring a concrete slab, preparing footings for a sub-floor or completing a basement.

  • This stage involves the construction of the main structural support system for the home, including the floor joists, wall studs, and roof rafters. The framing process also includes the installation of sub-flooring.

  • This stage involves the installation of the roofing system. This step will also see the start of the install of the flashing, capping and roof drainage system.

  • This stage involves the installation of the kitchen cabinetry and bench tops. This stage may include the installation of the sink, faucet, and appliances.

  • This stage involves the construction of the driveway, which may include tasks such as grading, excavating, pouring concrete, or installing pavers or other materials.

  • This final stage includes the installation of any lawn, trees, shrubs, and other landscaping features.

Follow us for MORE updates


 

Learn more about Kilsyth

Did you know that BIRKILL has built and sold other properties in Kilsyth?

Learn about why BIRKILL loves Kilsyth as a suburb and area to develop properties in and see all the other properties that BIRKILL has sold and developed in this area, plus any that might be coming soon.